Construction gallery
How a FormaHaus comes together — from the first earthworks to the finished facade. Click an image to enlarge. The shots follow the five phases of our build process.
1
Ground prep & foundation
Earthworks, compaction, foil, insulation, Ø8 mm rebar.


2
Concrete slab (C25/30)
Reinforced slab ≥ 20 cm, vibrated and quality-controlled.


3
Steel frame, PIR panels & windows
Prefabricated S350 frame assembly, sandwich panels, windows.


4
Installations
Plumbing, electrical, underfloor heating, ventilation, AC, Smart Home.


5
PUR insulation & finishing
PUR foam, drywall, painting, bathroom, flooring — key handover.


✓
The result
Turnkey in about 3 months.


Note: The images shown are FormaHaus-branded placeholders. Replace the files in the
/gallery/ folder with real construction photos (same filenames) — the gallery and lightbox keep working unchanged.
Could yours be next?
Start with our inquiry assistant — a few steps to your non-binding fixed-price quote.
Get a quote