stalart.com.plFrom groundbreaking to key handover in just 3 months. We coordinate the entire build with our construction partners — you get a single point of contact and full transparency at every stage.
Site prep includes excavation, soil replacement with load-bearing material and compaction to required parameters. Then base layers and 0.2 mm foil with min. 20 cm overlap. Next 15 cm insulation (XPS or EPS), moisture barrier and min. Ø8 mm rebar in two layers. Side insulation of the slab (min. 5 cm) extends min. 20 cm above ground level.
Concrete C25/30 or higher (25 MPa at 28 days) distributed evenly over the rebar and vibrated. Minimum thickness 20 cm. Quality control at every step. Steel frame prefabrication starts in parallel.
Assembly of prefabricated steel frame on the slab (anchors, plates, bolts). Then PIR sandwich panels — continuous thermal insulation, durable connections. Finally windows and exterior doors (energy-efficient).
Complete installation:
PUR foam in wall cavities provides airtightness and thermal insulation. Then drywall: plasterboard or FIBO panels. Then painting (white walls and ceilings), interior doors with hardware, full bathroom (fixtures, ceramics, tiles), flooring (panels or tiles). Key handover.
2026 Promo: Turnkey from €1,500/m². Fixed-price guarantee — no surprises. Get a quote →
Construction is carried out by our partner companies with documented experience.